Industrial clarifier repair using HJ3’s carbon fiber system.

Active Leak on primary clarifier tank.
Before
HJ3 team repairing the primary clarifier tank.
During
Finished primary clarifier tank repair.
After

Problem vs solution:

  • The clarifier had approximately 80% steel loss on its sidewalls, upper tank ring, and dome.
  • The exterior temperature of the sidewalls was 140º.
  • Areas needing repair included a wall patch, the tank sidewall and dome roof connection.
  • A 36 ft. Diameter overflow pipe also needed repair.
  • HJ3’s CarbonSeal™ carbon fiber system was installed and a chemical and temperature-resistant topcoat was applied to protect the system from the tank’s extreme temperatures.