Waste water tank repair saves power plant $3 Million.

wastewater tank with through holes
Before
CarbonSeal carbon fiber being applied to the steel tank walls
During
Top coat on the walls of the tank
After

Problem vs solution:

  • A 2.5 million gallon waste water tank was leaking.
  • Previous patch attempts had been made, however all had failed.
  • The tank was so degraded that it had to be fully replaced or repaired.
  • HJ3’s CarbonSeal™ system strengthened the tank’s walls, floor, and columns.
  • The plant did not have to shut down for replacement.
  • The repair was finished in 3 weeks and saved the client $3 million.