Shopping mall parking garage beam strengthening.

The parking lot concrete beams were cleaned and cracks patched prior to installing the CarbonSeal carbon fiber polymer system.
Before
hj3 prepping beams for carbonseal carbon fiber installation
During
CarbonSeal carbon fiber installation prior to topcoat and painting
After

Problem vs solution:

  • Moisture and oxygen seeped into cracks, corroding the internal steel.
  • The steel bloomed and expanded, weakening the beams.
  • The HJ3 Civil™ system fixed thousands of square feet of damaged concrete.
  • The parking garage remained open for the entirety of the repair.
  • The client saved significantly compared to the cost of replacement and disruption to service.