Railroad bridge concrete repair with no downtime and 80% savings.

HJ3 team demoing concrete around exposed and degraded rebar.
Before
During
After

Problem vs solution:

  • This rail bridge hadn’t been repaired in over 20 years.
  • The bridge had severe spalling and the rebar beneath the deck had corroded.
  • HJ3’s Civil™ system restored the bridge’s flexural and shear strength.
  • Repair was finished in 11 days with no downtime or rail schedule disruption.
  • The client saved 80-90% versus replacement costs.