March 28, 2023
Blog

Concrete and Steel Repairs at Salt Mining Facility

Mining facility concrete and steel repairs | Salt mine concrete had significant efflorescence, spalling, steel loss with structural degradation.

Mining facility concrete and steel repairs.

Over 60 years of salt mining had deteriorated this facility which required concrete and steel repairs. Walls, columns, beams and secondary members had significant efflorescence, spalling, steel loss and structural degradation.

Concrete and steel repairs

Walls, columns, beams and secondary members showing damage from the environment.

Interior of mine showing significant efflorescence, spalling, and structural degradation.

Significant efflorescence, spalling, steel loss and structural degradation[/caption]The facility, located near Lake Huron, is susceptible to severe lake storms creating excessive moisture and extreme cold. The salt production environment causes significant chloride ion migration, rebar swelling/poppingand subsequent concrete spalling.

CarbonSeal carbon fiber on beams and slabs.

This image shows CarbonSeal carbon fiber with topcoat, and before topcoat application.

CarbonSeal system installation with topcoat applied to beams, slabs and walls.

The finished CarbonSeal system installation with topcoat applied to beams, slabs and walls.HJ3 engineered a composite fiber system to replace the lost tensile strength and shear reinforcement in the external wall, targeted columns, and internal supports. The CarbonSeal™ repair restored the strength of the facility, repairing and strengthening 9,800 sq ft surface area with 20,000sq ft of carbon fiber, extending its life by up to 30 years.

HJ3's team of engineers will design custom structural solutions for you. Call us today! 877-303-0453 or email us at: info@hj3.com

LATEST NEWS and BLOG

Learn More

Speed to Solution™: How HJ3 Is Transforming Emergency Engineering Support
Videos
June 18, 2025

Speed to Solution™: How HJ3 Is Transforming Emergency Engineering Support

When critical infrastructure fails, time is everything. HJ3’s Speed to Solution™ delivers same-day design calculations, same-day shipments, and no surcharge fees. From shipping $3M in materials in a week to supporting emergency asset repairs, HJ3’s all-in response model sets a new standard in rapid, reliable service.

HJ3’s Patented NFPA-69 Compliant Carbon Fiber System with ESD Technology
Blog
May 14, 2025

HJ3’s Patented NFPA-69 Compliant Carbon Fiber System with ESD Technology

HJ3’s patented carbon fiber repair system with ESD technology restores structural integrity and safely dissipates static. NFPA-69 compliant, cold-applied, and explosion-resistant, this technology is ideal for high-risk power generation environments.

get started

Request a quote, and we'll get back to you within 24 hours.

Request a quote